Projects Schools, Lekki, Lagos
A Lekki secondary school with a computer lab that stays on
Eight hundred students, a 40 seat computer laboratory and boarding houses that needed light for evening prep. School hours match the sun almost exactly.
- Client
- Brightwater Girls' College
- Location
- Lekki, Lagos
- Switched on
- 2024
- Inverters
- 3 x 12 kVA, three phase
- Generator hours a day
- 9 before, 0.6 after
- Payback
- 4.6 years
- CO₂ avoided a year
- 29 tonnes
- Figures
- Demo data
The brief
The college wanted computer-based exam practice without generator noise in the hall, and safe lighting in the boarding houses after dark.
What we built
- A large daytime array matched to the timetable, with classes and the laboratory running directly on sunlight.
- Batteries sized for boarding house lighting, fans and evening prep, not daytime loads.
- A school-term schedule in the app, so the system rests the batteries over holidays.
- A half-day lesson for SS2 physics students on how the system works.
Share of the site's energy from sunlight, by month.
Average 65 percent across the months the site was open. The dip from June to August is the heart of the rainy season, when the grid and generator do more of the work.
₦25,440,000
saved in the first year, fuel and servicing
- January: 70 percent70
- February: 66 percent66
- March: 72 percent72
- April: 58 percent58
- May: 74 percent74
- June: 71 percent71
- July: 63 percent63
- August: closed for holidaysoff
- September: 52 percent52
- October: 73 percent73
- November: 75 percent75
- December: 40 percent40
Our students sit practice exams without the hum of a generator outside the window. That alone was worth it.